LelongTips.com.my
RM
RM
sq.ft
sq.ft
13
Flat

Unit No., Block A, Pangsapuri Enggang Jalan Kinrara 6F, Bandar Kinrara, 47180 Puchong, Selangor

Flat

LACA
2nd Auction
Online
Low Cost
RM212 per sf
Auction Date & Time

15th Apr 2026 (Wed), 11.00AM

Auction Price

RM144,000.00

Past Auction Price:
RM160,000 (Mar 2026)
Reduced By:
-10% (RM16,000)
Reduced By:
-10% (RM16,000)
Built Up
678 sq.ft
Deposit
10%
Register to Bid
Download Auction Documents
Loan Calculator
RM
RM
%
RM
%
Years

Note: For intending bidders, please call our hotline for latest auction status as auction may be withdrawn/called off at last minute. By accessing this website, you have agreed to be bound by all the Terms and Conditions. The photographs shown herein are solely for general identification and information. the Web Site makes no representation or warranty as to the accuracy or the actual condition of the property.

Apply as Panel Referrer

Note: For intending bidders, please call our hotline for latest auction status as auction may be withdrawn/called off at last minute. By accessing this website, you have agreed to be bound by all the Terms and Conditions. The photographs shown herein are solely for general identification and information. the Web Site makes no representation or warranty as to the accuracy or the actual condition of the property.

Apply as Panel Referrer Apply as Panel Referrer

Similar Properties

Auction Price RM140,000

Auction Date
15 Apr 2026 (Wed)

Flat Bandar Bukit Puchong, Selangor

Block D, Rumah Pangsa Bandar Bukit Puchong, Jalan BP 1/2, 47120 Puchong, Selangor

Flat

Flat

Auction Date
15 Apr 2026 (Wed)
Built-up
657 sq.ft

Auction Price RM135,000

Auction Date
15 Apr 2026 (Wed)

Taman Mawar, Selangor

Jalan TK 5/26, Taman Mawar, 13KM, Jalan Puchong, 47100 Puchong, Selangor

Flat

Flat

Auction Date
15 Apr 2026 (Wed)
Built-up
720 sq.ft

Auction Price RM150,000

Auction Date
21 Apr 2026 (Tue)

Pangsapuri Sri Dahlia, Selangor

Pangsapuri Sri Dahlia, Laman Puteri 3, Bandar Puteri, 47100 Puchong, Selangor

Flat

Flat

Auction Date
21 Apr 2026 (Tue)
Built-up
689 sq.ft